Mount solar panels directly to your Sprinter’s OEM roof rails with our direct mount tower brackets for NCV3 and VS30 Sprinter high-roof vans. These tower brackets are designed for NCV3 and VS30 Sprinter high-roof vans with OEM roof rails spaced 51.875" apart. They may also be compatible with other panels and vehicles—contact us for assistance with your specific application.
Each direct mount kit contains two tower brackets and all needed hardware. Two kits are required for one solar panel. One additional kit is needed for attaching each subsequent panel forming one large array of multiple panels. See layout image.
Key Features:
âś… Mount panels (between 46" and 52" in length) directly to you High Roof Sprinter van's OEM roof rails (without crossbars)
âś… Includes two tower brackets and all necessary hardware per kit
âś… Requires 2 kits per panel; additional kits needed for multi-panel arrays
✅ Compatible with Fiamma awnings—contact us for details
âś… Includes two tower brackets and all necessary hardware per kit
âś… Requires 2 kits per panel; additional kits needed for multi-panel arrays
✅ Compatible with Fiamma awnings—contact us for details
If your Sprinter lacks Mercedes OEM roof rails, we offer Spacer Pads that work with our Tower Brackets. See our listing for Spacer Pads at https://diyvan.com/products/pair-of-spacer-pads-and-hardware-for-sprinter-vans-with-no-oem-rail
DISCLAIMER
Failure to follow warnings below may allow rack to come loose from vehicle and cause injury or death. Do not exceed 20 lbs load on each tower.
- Do not extend any component more than 4" beyond forward or rearward most towers.
- Do not exceed total allowable load by vehicle manufacturer.
- Use all available attachment points on van roof.
- Do not install roof top deck or climb on rack.
- Check and tighten all hardware after 100 miles and every 500 miles there-after.
- Check overall integrity of rack every 500 miles or monthly whichever is more frequent.